CIESC Journal
• 化工学报 • 上一篇 下一篇
陆祖平,张尔荣,施亚钧
出版日期:
发布日期:
Lu Zuping Zhang Errong and Shi Yajun (East China Institute of Chemical Technology, Shanghai)
Online:
Published:
摘要: 本文从理论上论证了实验室吸收装置积分模拟工业吸收设备的可能性.在实验室中,在7组不同实验条件下,用球柱塔积分模拟填料塔,最大误差为5.9%.
Abstract: It was theoretically shown that simulation of industrial absorption tower with laboratory equipment is possible. Simulation of packed tower with Sphe-ro-Cylindric Column was made in laboratory under seven different sets of conditions. The experimental results indicate that maximum error is about 5.9%.
陆祖平,张尔荣,施亚钧. 实验室球柱吸收塔模拟填料吸收塔 [J]. CIESC Journal.
Lu Zuping Zhang Errong and Shi Yajun (East China Institute of Chemical Technology, Shanghai). A Study on Simulation of Packed Absorption Tower with Sphero-Cylindric AbsorptionColumn in Laboratory[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://hgxb.cip.com.cn/CN/
https://hgxb.cip.com.cn/CN/Y1989/V40/I6/720