化工学报 ›› 2013, Vol. 64 ›› Issue (6): 2153-2159.DOI: 10.3969/j.issn.0438-1157.2013.06.034

• 过程系统工程 • 上一篇    下一篇

具有净化单元氢网络的迭代设计方法

潘春晖1, 王焕云2, 马力2, 鲁明珠2   

  1. 1. 沧州师范学院化学系,河北 沧州 061001;
    2. 沧州师范学院机电工程系,河北 沧州 061001
  • 收稿日期:2012-10-07 修回日期:2012-12-24 出版日期:2013-06-05 发布日期:2013-06-05
  • 通讯作者: 潘春晖(1968—),男,副教授。
  • 作者简介:潘春晖(1968—),男,副教授。
  • 基金资助:

    河北省应用基础研究计划重点基础研究项目(11966725D);河北省科技支撑计划项目(12274508)。

An iterative method for designing hydrogen networks with purification units

PAN Chunhui1, WANG Huanyun2, MA Li2, LU Mingzhu2   

  1. 1. Department of Chemistry, Cangzhou Teachers' College, Cangzhou 061001, Hebei, China;
    2. Department of Mechanical Engineering, Cangzhou Teachers' College, Cangzhou 061001, Hebei, China
  • Received:2012-10-07 Revised:2012-12-24 Online:2013-06-05 Published:2013-06-05
  • Supported by:

    supported by the Basic Research Project Foundation of Hebei Province(11966725D)and the Science and Technology Support Project of Hebei Province(12274508).

摘要: 提出一种具有净化单元氢网络的迭代设计方法。首先假设净化后源物流的量足够大,将之看作系统的新增源物流即可构成具有净化单元的初始氢网络。运用多氢源匹配方法来设计氢网络,从而得到净化后源物流的用量Freg和所有未回用的内部源物流合并计算出的净化后源物流的量Fregtotal。比较FregFregtotal的大小,当Fregtotal<Freg时,将Fregtotal作为下一次迭代净化后源物流的量的初值,只需几次迭代即可得到最终设计;当FregtotalFreg时,将Freg的值作为最终设计的净化后源物流的用量,按照由Freg值确定出的净化前源物流的量选取杂质浓度较低的未回用的内部源物流用于净化,对此种情况,不需后续迭代即可得到最终设计。对文献中几个实例的研究表明,该方法设计步骤简单可行,不仅能得到氢消耗目标值,而且还能得到氢网络的具体设计。

关键词: 氢网络, 净化再利用, 迭代方法, 最小氢消耗

Abstract: An iterative method for designing hydrogen networks with purification units is presented.First, the purified source flow rate is assumed to be large enough, regarding the purified source as a new source.And then, the initial hydrogen network with purification units is constituted.By using the source matching method, the hydrogen network is designed, the purified source amount Freg that can be used and the purified source amount Fregtotal from purifying all internal sources that have not been reused are obtained.When Fregtotal<Freg,Fregtotal is regarded as the initial value of the purified source in the next iteration, and the final design is obtained by only a few iterations.When FregtotalFreg,Freg is used as the value of the purified source of the final design, and the internal source with the lowest impurity concentration that has not been reused for purification is selected.In the latter case, the final design is obtained without further iterations.By examining some examples reported in literatures, it is found that the method are simple and effective, moreover, not only the hydrogen consumption target value but also the specific design of hydrogen network can be obtained by using this method.

Key words: hydrogen network, purification reuse, iteration method, minimum hydrogen consumption

中图分类号: