• 化工学报 • Previous Articles     Next Articles

A Study on Simulation of Packed Absorption Tower with Sphero-Cylindric AbsorptionColumn in Laboratory

Lu Zuping Zhang Errong and Shi Yajun (East China Institute of Chemical Technology, Shanghai)   

  • Online:1989-12-25 Published:1989-12-25

实验室球柱吸收塔模拟填料吸收塔

陆祖平,张尔荣,施亚钧   

  1. 华东化工学院,华东化工学院,华东化工学院 上海,现在华南理工大学化学工程研究所工作 ,上海 ,上海

Abstract: It was theoretically shown that simulation of industrial absorption tower with laboratory equipment is possible. Simulation of packed tower with Sphe-ro-Cylindric Column was made in laboratory under seven different sets of conditions. The experimental results indicate that maximum error is about 5.9%.

摘要: 本文从理论上论证了实验室吸收装置积分模拟工业吸收设备的可能性.在实验室中,在7组不同实验条件下,用球柱塔积分模拟填料塔,最大误差为5.9%.