CIESC Journal ›› 2009, Vol. 60 ›› Issue (S1): 100-105.
Previous Articles Next Articles
CAO Wensheng, LU Xuesheng, LIN Wensheng, GU Anzhong
Online:
Published:
曹文胜,鲁雪生,林文胜,顾安忠
Abstract:
In the field of natural gas liquefaction, the small-scale natural gas liquefier has attracted more and more attention at home and abroad, due to its small volume, mobile transportation, convenient start-up and shut-down, as well as skid-mounted package.In this paper, technologic design of the small-scale liquefied natural gas plant in skid-mounted package is carried through based on No.1 station outgoing gas of 23th gas field of Zhongyuan oil field.The simulative calculation of the small-scale LNG project achieves temperature, pressure, enthalpy, entropy, flow rate, component mole fractions in liquid and gas phase of every node in the whole process that using the methods of compound modularized adsorption technology and SP-MRC refrigeration.The result shows LNG recovery is more than 90% and power consumption cost is only 0.379 kW·h·m-3, which is worth 0.19 CNY·m-3.
Key words: 小型LNG装置, 模块化撬装, 预处理, 液化流程
小型LNG装置,
摘要:
以中原油田文23气田1号集气站外输气为例,对小型LNG装置的模块化撬装进行了工艺技术研究,采用特有的模块化复合吸附工艺和SP-MRC混合制冷工艺,得到天然气净化与液化相耦合的全流程节点的温度、压力、摩尔焓、摩尔熵、摩尔流量、气相分率和气液两相组分的摩尔分数。结果表明:LNG回收率>90%,该装置的能耗成本仅为0.379 kW·h·m-3,相当于0.19元·m-3天然气。
关键词: 小型LNG装置, 模块化撬装, 预处理, 液化流程
CAO Wensheng, LU Xuesheng, LIN Wensheng, GU Anzhong. Natural gas purification and liquefaction process of small-scale LNG project in skid-mounted package[J]. CIESC Journal, 2009, 60(S1): 100-105.
曹文胜, 鲁雪生, 林文胜, 顾安忠. 小型LNG装置的模块化撬装工艺技术 [J]. 化工学报, 2009, 60(S1): 100-105.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://hgxb.cip.com.cn/EN/
https://hgxb.cip.com.cn/EN/Y2009/V60/IS1/100
Effect of space velocity in syngas reduction on performance of Fe/Cu/K/SiO2 catalyst for slurry phase Fischer-Tropsch synthesis
ZOU Hanbo;DONG Xinfa;LIN Weiming
Selective CO oxidation in hydrogen-rich gas over Cu-Zr-Ce-O mixed oxide catalysts