[1] |
RUBEN R, JOSE A V R. The hybrid flow shop scheduling problem[J]. European Journal of Operational Research, 2010, 205(1): 1-18.
|
[2] |
SALVADOR M S. A solution of a special class of flow shop scheduling problems[C]//Symposium on the Theory of Scheduling and Its Applications. Berlin, 1973: 83-91.
|
[3] |
MARICHELVAM M K, PRABAHARAN T, YANG X S. Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan[J]. Applied Soft Computing, 2014, 19: 93-101.
|
[4] |
吴云高, 王万良. 基于遗传算法的混合flowshop调度[J]. 计算机工程与应用, 2002, 38(12): 82-84. WU Y G, WANG W L. Hybrid flowshop scheduling method based on genetic algorithm[J]. Computer Engineering and Applications, 2002, 38(12): 82-84.
|
[5] |
SIMON D. Biogeography-based optimization[J]. IEEE Trans. Evolutionary Computation, 2008, 12(6): 702-713.
|
[6] |
BHATTACHARYA A, CHATTOPADHYAY P K. Hybrid differential evolution with biogeography-based optimization for solution of economic load dispatch[J]. Power Systems, IEEE Transactions on, 2010, 25(4): 1955-1964.
|
[7] |
RARICK R, SIMON D, VILLASECA F E, et al. Biogeography-based optimization and the solution of the power flow problem[C]//Systems, Man and Cybernetics, 2009: 1003-1008.
|
[8] |
LIN J. A hybrid biogeography-based optimization for the fuzzy flexible job-shop scheduling problem[J]. Knowledge-Based Systems, 2015, 78: 59-74.
|
[9] |
汤洪涛, 丁彬楚, 李修琳, 等. 基于改进免疫遗传算法的混合车间调度研究[J]. 中国机械工程, 2014, (9): 1189-1194, 1201. TANG H T, DING B C, LI X L, et al. Improved immune genetic algorithm for mixed-model scheduling problem[J].China Mechanical Engineering, 2014, (9): 1189-1194, 1201.
|
[10] |
ONWUBOLU G DAVENDRA D. Scheduling flow shops using differential evolution algorithm[J]. European Journal of Operational Research,2006, 171(2): 674-692.
|
[11] |
O?UZ C, ZINDER Y, JANIAK A, et al. Hybrid flow-shop scheduling problems with multiprocessor task systems[J]. European Journal of Operational Research, 2004, 152(1): 115-131.
|
[12] |
OGUZ C, ERCAN M F. A genetic algorithm for hybrid flow shop scheduling with multiprocessor tasks[J]. Journal of Scheduling, 2005, 8(4): 323-351.
|
[13] |
WANG X H, DUAN H B. A hybrid biogeography-based optimization algorithm for job shop scheduling problem[J]. Computers & Industrial Engineering, 2014, 73: 96-114.
|
[14] |
WANG Z C, WU X B. Hybrid biogeography-based optimization for integer programming[J]. The Scientific World Journal, 2014, 12 (6) : 1-7.
|
[15] |
SIMON D. A probabilistic analysis of a simplified biogeography-based optimization algorithm[J]. Evolutionary Computation, 2011, 19(2): 167-188.
|
[16] |
BOUSSAÏD I, CHATTERJEE A, SIARRY P, et al. Biogeography-based optimization for constrained optimization problems[J]. Computers & Operations Research, 2012, 39(12): 3293-3304.
|
[17] |
王存睿, 王楠楠, 段晓东, 等. 生物地理学优化算法综述[J]. 计算机科学, 2010, 37(7): 34-38. WANG C R, WANG N N, DUAN X D, et al. Survey of biogeography-based optimization[J]. Computer Science, 2010, 37(7): 34-38.
|
[18] |
耿佳灿, 顾幸生. 不确定条件下中间存储时间有限多产品间歇生产过程调度[J]. 化工学报, 2015, 66(1): 357-365. GEN J C, GU X S. Time-constrained intermediate storage multiproduct batch process scheduling with uncertainty[J]. CIESC Journal, 2015, 66(1) : 357-365.
|
[19] |
NAWAZ M, ENSCORE E, HAM I. A heuristic algorithm for the m-machine n-job flow shop sequencing problem[J]. Omega, 1983, 11(1): 11-95.
|
[20] |
LIAO C J, TJANDRADJAJA E, CHUNG T P. An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem[J]. Applied Soft Computing, 2012, 12(6): 1755-1764.
|