[1] |
SUN Yawen, ZHANG Jianhua, PENG Yongzhen, WANG Shuying.
Effect of additional carbon sources on nitrogen and phosphorus removal characteristics in A2/O-BCO process
[J]. CIESC Journal, 2018, 69(8): 3626-3634.
|
[2] |
WANG Meixiang, ZHAO Weihua, WANG Shuying, ZHANG Yong, PENG Yongzhen, PAN Cong, HUANG Yu.
Startup and stability of A2N2 double sludge system denitrifying phosphorus removal process
[J]. CIESC Journal, 2016, 67(7): 2987-2997.
|
[3] |
WANG Meixiang, ZHAO Weihua, HUANG Yu, PAN Cong, PENG Yongzhen, WANG Shuying.
Effect of nitrification duration distribution ratio in N-SBR unit on performance of A2N2 system operation
[J]. CIESC Journal, 2016, 67(12): 5259-5267.
|
[4] |
ZHANG Weitang, XUE Xiaofei, PANG Hongtao, ZHANG Jie, LI Dong, PENG Yongzhen.
Effect of C/N on performance of AAO-BAF process
[J]. CIESC Journal, 2015, 66(5): 1925-1930.
|
[5] |
WANG Cong, WANG Shuying, ZHANG Miao, PENG Yongzhen, ZENG Wei.
Analysis of COD, N and P in denitrifying phosphorus removal under multivariate condition
[J]. CIESC Journal, 2015, 66(4): 1467-1475.
|
[6] |
ZHANG Jianhua, PENG Yongzhen, ZHANG Miao, WANG Shuying, WANG Cong.
Effect of different electron acceptor ratios on removal of nitrogen and phosphorus and conversion and utilization of internal carbon source
[J]. CIESC Journal, 2015, 66(12): 5045-5053.
|
[7] |
ZHANG Yong, WANG Shuying, ZHAO Weihua, SUN Shihao, PENG Yongzhen, ZENG Wei.
Start-up of pilot-scale AAO-BAF two-sludge system
[J]. CIESC Journal, 2015, 66(10): 4228-4235.
|
[8] |
LUO Yahong, LI Dong, BAO Linlin, XU Da, CAI Yan'an, ZHANG Jie.
Shortcut nitrification and denitrifying phosphorus removal in improved A2/O technique with long SRT
[J]. CIESC Journal, 2014, 65(12): 4985-4996.
|
[9] |
MIAO Zhijia, XUE Guisong, WENG Dongchen, CAO Guihua, PENG Yongzhen.
Effect of nitrite on denitrifying phosphorous removal metabolism and N2O production by PAOs
[J]. CIESC Journal, 2013, 64(6): 2201-2207.
|
[10] |
LI Simin, DU Guoshuai, TANG Fengbing.
Treatment of low C/N wastewater by combined A2/O process with multipoint feeding
[J]. CIESC Journal, 2013, 64(10): 3805-3811.
|
[11] |
LIU Wei, YANG Dianhai, XU Li, JIA Chuan, LU Wenjian, BOSIRE O.I., SHEN Changming.
Effect of return sludge pre-concentration on biological phosphorus removal in a novel oxidation ditch
[J]. Chin.J.Chem.Eng., 2012, 20(4): 747-753.
|
[12] |
XU Wei, Lv Xiwu.
Modeling continuousflow two-sludge system
[J]. CIESC Journal, 2012, 63(2): 618-625.
|
[13] |
GUO Haiyan, GUO Zhen, FENG Tengteng, ZHANG Shoutong, ZHOU Jiti.
Characteristics and factors influencing denitrification and dephosphorization in sequencing batch moving bed biofilm reactor
[J]. CIESC Journal, 2012, 63(1): 251-257.
|
[14] |
HOU Jinliang;KANG Yong.
Research progress of biological removal of nitrogen and phosphorus in municipal sewage
[J]. , 2007, 26(3): 366-.
|