[1] |
Vaselenak J A, Grossmann J E, Websterberg A W.Heat integration in batch processing[J].Ind. Eng. Chem. Process Des.Dev., 1986, 25:357-366
|
[2] |
Kemp I C, Macdonald E K.Energy and process integration in continuous and batch processes (Part 1):Calculation of energy targets[J].Chemical Engineering Research & Design, 1989, 67 (5):495-509
|
[3] |
Kemp I C, Macdonald E K.Energy and process integration in continuous and batch processes (Part 2):Network design and process scheduling[J].Chemical Engineering Research & Design, 1989, 67 (5):510-516
|
[4] |
Kemp I C, Macdonald E K.Energy and process integration in continuous and batch processes (Part 3):A case study[J].Chemical Engineering Research & Design, 1989, 67 (5):495-509
|
[5] |
Liu L L, Du J, Xiao F, Chen L, Yao P J.Direct heat exchanger network synthesis for batch process with cost targets[J].Applied Thermal Engineering, 2011, 31:2665-2675
|
[6] |
Foo D C Y, Chew Y H, Lee C T.Minimum units targeting and network evolution for batch heat exchanger network[J].Appl.Therm.Eng., 2008, 28:2089-2099
|
[7] |
Du Jian (都健), Li Chunni (李春妮), Chen Li (陈理).Structure optimization of heat exchanger network for batch process based on pseudo-temperature[J].CIESC Journal (化工学报), 2010, 61 (12):3162-3166
|
[8] |
Polley G T, Sadr-kazemi N.Design of energy storage systems for batch process plants[J].Trans. IchemE, 1996, 74 (A):584-596
|
[9] |
Kemp I C, Deakin A W.The cascade analysis for energy and process integration of batch processes[J].Chemical Engineering Research Design, 1989, 67:495-509
|
[10] |
Zhao X G, Neill B K, Wood R M.Heat integration in batch process (Part 1):Process scheduling based on cascade analysis[J].Trans.IchemE, 1998, 76 (A):685-699
|
[11] |
Zhao X G, Neill B K, Wood R M.Heat integration in batch process (Part 2):Heat exchanger network design[J].Trans.IchemE, 1998, 76 (A):700-710
|
[12] |
Wang Y P, Smith R.Time pinch analysis[J].Chemical Engineering Research and Design, 1995, 73 (8):905-914
|
[13] |
Xia Xiuqing (夏修庆), Li Yugang (李玉刚), Zheng Shiqing (郑世清).Utility target of batch process with heat storage[J].Journal of Qingdao University of Science and Technology (青岛科技大学学报), 2007, 28 (2):138-141
|
[14] |
Foo D H Y.Automated targeting technique for batch process integration[J].Ind.Eng.Chem.Res., 2010, 49 (20):9899-9916
|
[15] |
Zhang Zaoxiao (张早校), Feng Xiao (冯霄), Yu Yongzhang (郁永章).Heat recovery for energy integration of batch process[J].Journal of Xi'an Jiaotong University (西安交通大学学报), 2000, 34 (8):79-82
|
[16] |
Pourali O, Amidpour M, Rashtchian D.Time decomposition in batch process integration[J].Chemical Engineering and Processing, 2006, 45:14-21
|
[17] |
Kemp I C.Pinch Analysis and Process Integration (夹点分析与过程集成)[M].Beijing:Chemical Industry Press, 2010:266-269
|
[18] |
Stoltze S, Mikkelsen J, Lorentzen B, Petersen P M, Qvale B.Waste-heat recovery in batch processes using heat storage[J].Transaction of the ASME, 1995, 117:142-149
|
[19] |
Krummenacher P, Favrat D.Indirect and mixed direct-indirect heat integration of batch processes based on pinch analysis[J].Int.J.Applied Thermodynamics, 2001, 4 (3):135-143
|
[20] |
Linnhoff B, Hindmarsh F.The pinch design method for heat exchanger network[J].Chemical Engineering Science, 1983, 38:745-763
|