2 |
Wang Z M, Yang J G. Bayesian reliability analysis for NC machine tools with minimal repair[J]. Computer Integrated Manufacturing Systems, 2014, 20(9): 2215-2220.
|
3 |
王慧, 赵国超, 宋宇宁, 等. 基于改进的威布尔分布的液压支架可靠性评估方法[J]. 中国安全科学学报, 2018, 28(5): 99-104.
|
|
Wang H, Zhao G C, Song Y N, et al. Reliability evaluation method of hydraulic support based on improved Weibull distribution[J]. China Safety Science Journal, 2018, 28(5): 99-104.
|
4 |
彭新凯, 王海清, 刘建利, 等. 石化安全设备寿命参数极大似然估计[J]. 中国安全科学学报, 2019, 29(2): 94-99.
|
|
Peng X K, Wang H Q, Liu J L, et al. Maximum likelihood estimation of petrochemical safety equipment lifetime parameters[J]. China Safety Science Journal, 2019, 29(2): 94-99.
|
5 |
汪航, 王海清, 刘芳. 基于贝叶斯方法的石化设备失效数据推断技术研究[J]. 安全与环境学报, 2014, 14(6): 5-7.
|
|
Wang H, Wang H Q, Liu F. Research on inference and forecasting technology for petrochemical equipment failure based on Bayesian method[J]. Journal of Safety and Environment, 2014, 14(6): 5-7.
|
6 |
王智明, 杨建国. 数控机床可靠性评估中的边界强度过程[J]. 上海交通大学学报, 2012, 46(10): 1622-1626, 1631.
|
|
Wang Z M, Yang J G. Bounded intensity process and its applications in reliability assessment of NC machine tools[J]. Journal of Shanghai Jiao Tong University, 2012, 46(10): 1622-1626, 1631.
|
7 |
Tanwar M, Rai R N, Bolia N. Imperfect repair modeling using Kijima type generalized renewal process[J]. Reliability Engineering & System Safety, 2014, 124: 24-31.
|
8 |
任丽娜, 芮执元, 王智明. 可修系统不完全维修连续比例强度模型及应用[J]. 中南大学学报(自然科学版), 2015, 46(7): 2467-2473.
|
|
Ren L N, Rui Z Y, Wang Z M. Imperfect repair continuous proportional intensity model for repairable systems and its application[J]. Journal of Central South University (Science and Technology), 2015, 46(7): 2467-2473.
|
9 |
Wang L, Hu H J, Wang Y Q, et al. The availability model and parameters estimation method for the delay time model with imperfect maintenance at inspection[J]. Applied Mathematical Modelling, 2011, 35(6): 2855-2863.
|
10 |
Geng J, Zhou D, Lv C, et al. A modeling approach for maintenance safety evaluation in a virtual maintenance environment[J]. Computer-Aided Design, 2013, 45(5): 937-949.
|
11 |
Kim J, Jeong H Y. Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles[J]. Reliability Engineering & System Safety, 2013, 117: 30-39.
|
12 |
Nguyen D T, Dijoux Y, Fouladirad M. Analytical properties of an imperfect repair model and application in preventive maintenance scheduling[J]. European Journal of Operational Research, 2017, 256(2): 439-453.
|
13 |
Kijima M, Sumita U. A useful generalization of renewal theory: counting processes governed by non-negative Markovian increments[J]. Journal of Applied Probability, 1986, 23(1): 71-88.
|
1 |
任丽娜, 芮执元, 刘军, 等. 数控机床最小维修的全寿命周期可靠性评估[J]. 上海交通大学学报, 2015, 49(1): 19-23.
|
|
Ren L N, Rui Z Y, Liu J, et al. Whole lifecycle reliability assessment of multiple NC machine tools with minimal repair[J]. Journal of Shanghai Jiao Tong University, 2015, 49(1): 19-23.
|
14 |
Cox D R. The Statistical Analysis of Dependencies in Point Process, Stochastic Point Processes[M]. Lewis P A W. New York: John Wiley, 1972: 55-66.
|
15 |
Syamsundar A, Naikan V N A. Imperfect repair proportional intensity models for maintained systems[J]. IEEE Transactions on Reliability, 2011, 60(4): 782-787.
|
16 |
张根保, 刘杰, 高琦樑, 等. 多台数控机床不完全维修的可靠性评估[J]. 重庆大学学报, 2014, 37(2): 1-6.
|
|
Zhang G B, Liu J, Gao Q L, et al. Reliability assessment of multiple NC machine tools with imperfect repair[J]. Journal of Chongqing University, 2014, 37(2): 1-6.
|
17 |
Wang Z M, Yu X. Log-linear process modeling for repairable systems with time trends and its applications in reliability assessment of numerically controlled machine tools[J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2013, 227(1): 55-65.
|
18 |
Gasmi S. Estimating parameters of a log-linear intensity for a repairable system[J]. Applied Mathematical Modelling, 2013, 37(6): 4325-4336.
|
19 |
Lim J H, Qu J, Zuo M J. Age replacement policy based on imperfect repair with random probability[J]. Reliability Engineering & System Safety, 2016, 149: 24-33.
|
20 |
Almalki S J, Nadarajah S. Modifications of the Weibull distribution: a review[J]. Reliability Engineering & System Safety, 2014, 124: 32-55.
|
21 |
Wang Z M, Yang J G. Numerical method for Weibull generalized renewal process and its applications in reliability analysis of NC machine tools[J]. Computers & Industrial Engineering, 2012, 63(4): 1128-1134.
|
22 |
Caroni C. “Failure limited” data and TTT-based trend tests in multiple repairable systems[J]. Reliability Engineering & System Safety, 2010, 95(6): 704-706.
|
23 |
Kvaløy J T, Lindqvist B H. TTT-based tests for trend in repairable systems data[J]. Reliability Engineering & System Safety, 1998, 60(1): 13-28.
|
24 |
Chen X M. Using akaike information criterion for selecting the field distribution in a reverberation chamber[J]. IEEE Transactions on Electromagnetic Compatibility, 2013, 55(4): 664-670.
|
25 |
张根保, 李冬英, 刘杰, 等. 面向不完全维修的数控机床可靠性评估[J]. 机械工程学报, 2013, 49(23): 136-141.
|
|
Zhang G B, Li D Y, Liu J, et al. Reliability assessment for multiple NC machine tools oriented to general repair[J]. Journal of Mechanical Engineering, 2013, 49(23): 136-141.
|
26 |
王智明, 杨建国, 王国强, 等. 多台数控机床的时间截尾可靠性评估[J]. 哈尔滨工业大学学报, 2011, 43(3): 85-89.
|
|
Wang Z M, Yang J G, Wang G Q, et al. Reliability evaluation of multiple NC machine tools with time truncation[J]. Journal of Harbin Institute of Technology, 2011, 43(3): 85-89.
|
27 |
Ghosh A, Majumdar S K. Modeling failure types and failure times of turning and boring machine systems[J]. International Journal of Quality & Reliability Management, 2010, 27(7): 815-831.
|
28 |
王海清, 陈韬婕, 刘祥妹. 数字化液化天然气接收站综合实验平台开发[J]. 实验室研究与探索, 2017, 36(6): 249-254.
|
|
Wang H Q, Chen T J, Liu X M. Development of comprehensive experimental platform for LNG receiving terminal demanded by safety engineering international education[J]. Research and Exploration in Laboratory, 2017, 36(6): 249-254.
|
29 |
王海清, 徐慧敏, 田英帅, 等. 基于ALOHA软件探索LNG接收站仿真实验室的优化设计[J]. 实验技术与管理, 2020, 37(3): 230-234.
|
|
Wang H Q, Xu H M, Tian Y S, et al. Exploration on optimization design of simulation laboratory for LNG receiving station based on ALOHA software[J]. Experimental Technology and Management, 2020, 37(3): 230-234.
|
30 |
朱建鲁, 李玉星, 王武昌, 等. LNG接收终端工艺流程动态仿真[J]. 化工学报, 2013, 64(3): 1000-1007.
|
|
Zhu J L, Li Y X, Wang W C, et al. Dynamic simulation of LNG import terminal process[J]. CIESC Journal, 2013, 64(3): 1000-1007.
|
31 |
鲁毅, Yap E, 刘昳蓉, 等. 可靠性、可用性与可维修性分析在LNG接收站产能预测中的应用 [J]. 化工学报, 2015, 66: 430-438.
|
|
Lu Y, Yap E, Liu Y R, et al. Reliability, availability and maintainability(RAM)modeling to predict production performance of LNG storage terminal[J]. CIESC Journal, 2015, 66: 430-438.
|
32 |
. Petroleum, petrochemical and natural gas industries — collection and exchange of reliability and maintenance data for equipment[S]. Switzerland: ISO, 2016.
|
33 |
SINTEF, NTNU. Offshore Reliability Data Handbook[M]. 6th ed. Norway: Det Norske Veritas (DNV), 2015.
|
34 |
屈持, 王海清, 刘建利, 等. 基于最小维修的石化安全设备区间截尾寿命数据分析[J]. 化工进展, 2020, 39(11): 4384-4390.
|
|
Qu C, Wang H Q, Liu J L, et al. Interval censored life data of petrochemical safety equipment based on minimal maintenance[J]. Chemical Industry and Engineering Progress, 2020, 39(11): 4384-4390.
|
35 |
徐子军, 王海清, 陈韬婕, 等. 基于蒙特卡罗的石化设备寿命均值估计优化与应用[J]. 中国安全科学学报, 2016, 26(5): 70-75.
|
|
Xu Z J, Wang H Q, Chen T J, et al. Optimization of petrochemical equipment MTTF estimation based on Monte Carlo and its application[J]. China Safety Science Journal, 2016, 26(5): 70-75.
|
36 |
Preacher K J, Selig J P. Advantages of Monte Carlo confidence intervals for indirect effects[J]. Communication Methods and Measures, 2012, 6(2): 77-98.
|
2 |
王智明, 杨建国. 数控机床最小维修的贝叶斯可靠性分析[J]. 计算机集成制造系统, 2014, 20(9): 2215-2220.
|