CIESC Journal ›› 2020, Vol. 71 ›› Issue (3): 1111-1121.DOI: 10.11949/0438-1157.20191492
• Process system engineering • Previous Articles Next Articles
Yiping FENG(),Tuchao ZHANG,Xin CHEN
Received:
2019-12-08
Revised:
2019-12-16
Online:
2020-03-05
Published:
2020-03-05
Contact:
Yiping FENG
通讯作者:
冯毅萍
基金资助:
CLC Number:
Yiping FENG, Tuchao ZHANG, Xin CHEN. Multi factor production cost modeling method for intelligent manufacturing[J]. CIESC Journal, 2020, 71(3): 1111-1121.
冯毅萍, 章途潮, 陈歆. 面向智能制造的多要素生产成本建模方法[J]. 化工学报, 2020, 71(3): 1111-1121.
Add to citation manager EndNote|Ris|BibTeX
成本节点 类型 | 成本要素类型 | |||||
---|---|---|---|---|---|---|
折旧 | 材料 | 能耗 | 维护 | 运行 | 其他 | |
加工设备 | √ | √ | √ | √ | √ | √ |
数字化资源 | √ | √ | √ | √ | √ | √ |
物流 | √ | √ | √ | √ | √ | √ |
库存 | √ | √ | √ | √ | √ | √ |
公用工程 | √ | √ | √ | √ | √ | √ |
Table 1 Itemized cost element types
成本节点 类型 | 成本要素类型 | |||||
---|---|---|---|---|---|---|
折旧 | 材料 | 能耗 | 维护 | 运行 | 其他 | |
加工设备 | √ | √ | √ | √ | √ | √ |
数字化资源 | √ | √ | √ | √ | √ | √ |
物流 | √ | √ | √ | √ | √ | √ |
库存 | √ | √ | √ | √ | √ | √ |
公用工程 | √ | √ | √ | √ | √ | √ |
成本节点 类型 | 成本要素类型 | |||||
---|---|---|---|---|---|---|
资质 | 培训 | 工资 | 福利 | 健康 | 其他 | |
人力资源 | √ | √ | √ | √ | √ | √ |
Table 2 Human resources cost elements
成本节点 类型 | 成本要素类型 | |||||
---|---|---|---|---|---|---|
资质 | 培训 | 工资 | 福利 | 健康 | 其他 | |
人力资源 | √ | √ | √ | √ | √ | √ |
项目 | 成本要素核算值 | |||||||
---|---|---|---|---|---|---|---|---|
折旧 | 设备能力 | 能耗 | 维护 | 工资 | 人员能力 | 成本 | ||
调度排产 | 数字化资源 | √ | √ | √ | √ | √ | ||
调度人员 | √ | √ | √ | |||||
指令下达 | 数字化资源 | √ | √ | √ | √ | √ | ||
指挥人员 | √ | √ | √ | |||||
生产监控 | 数字化资源 | √ | √ | √ | √ | √ | ||
监控人员 | √ | √ | √ | |||||
绩效考核 | 数字化资源 | √ | √ | √ | √ | √ | ||
考核人员 | √ | √ | √ | |||||
成本合计 | √ | √ | √ | √ | √ | √ | √ |
Table 3 Production scheduling business cost accounting matrix
项目 | 成本要素核算值 | |||||||
---|---|---|---|---|---|---|---|---|
折旧 | 设备能力 | 能耗 | 维护 | 工资 | 人员能力 | 成本 | ||
调度排产 | 数字化资源 | √ | √ | √ | √ | √ | ||
调度人员 | √ | √ | √ | |||||
指令下达 | 数字化资源 | √ | √ | √ | √ | √ | ||
指挥人员 | √ | √ | √ | |||||
生产监控 | 数字化资源 | √ | √ | √ | √ | √ | ||
监控人员 | √ | √ | √ | |||||
绩效考核 | 数字化资源 | √ | √ | √ | √ | √ | ||
考核人员 | √ | √ | √ | |||||
成本合计 | √ | √ | √ | √ | √ | √ | √ |
1 | 蒋伟.基于精益会计体系的企业成本管理研究[D].天津:天津理工大学,2013. |
Jiang W.Research on the enterprise cost management based on lean accounting system[D].Tianjin:Tianjin University of Technology,2013. | |
2 | 万寿义,王红军.关于制定统一成本核算制度若干问题的探讨[J].财务与会计,2012, (1):38-40. |
Wan S Y,Wang H J.Study on several issues concerning the formulation of unified cost accounting system[J].Finance and Accounting,2012, (1):38-40. | |
3 | Salmi A,David P,Blanco E,et al.A review of cost estimation models for determining assembly automation level[J].Computers & Industrial Engineering,2016,98:246-259. |
4 | Solow R M.A contribution to the theory of economic growth[J].The Quarterly Journal of Economics,1956,70(1):65-94. |
5 | 程新建.作业成本法在化工产品核算与管理中的应用[J].财务与会计,2018, (4):42-44. |
Cheng X J.Application of activity-based costing in accounting and management of chemical products[J].Finance and Accounting,2018, (4):42-44. | |
6 | Almeida A,Cunha J.The implementation of an activity-based costing (ABC) system in a manufacturing company[J].Procedia Manufacturing,2017,13:932-939. |
7 | 刘力嘉,王秋萍,徐红军.基于作业成本法的炼化成本管控研究[J].计算机与应用化学,2013,20(8):875-879. |
Liu L J,Wang Q P,Xu H J.Study on cost management and controlling in refining and chemical based on activity-based costing[J].Computers and Applied Chemistry.2013,20(8):875-879. | |
8 | Savoretti A,Mandolini M,Raffaeli R,et al.Analysis of the requirements of an early life-cycle cost estimation tool: an industrial survey[J].Procedia Manufacturing,2017,11:1675-1683. |
9 | Bornschlegl M,Kreitlein S,Bregulla M,et al.A method for forecasting the running costs of manufacturing technologies in automotive production during the early planning phase[J].Procedia CIRP,2015,26:412-417. |
10 | Dui H,Si S,Yam R C M.A cost-based integrated importance measure of system components for preventive maintenance[J].Reliability Engineering & System Safety,2017,168:98-104. |
11 | Maier D,Vadastreanu A M,Keppler T,et al.Innovation as a part of an existing integrated management system[J].Procedia Economics and Finance,2015,26:1060-1067. |
12 | mida F H,Martin P,Vernadat F.Cost estimation in mechanical production: the cost entity approach applied to integrated product engineering[J].International Journal of Production Economics,2006,103(1):17-35. |
13 | Pehrsson L,Ng A H C,Stockton D.Industrial cost modelling and multi-objective optimization for decision support in production systems development[J].Computers & Industrial Engineering,2013,66(4):1036-1048. |
14 | Mrugalska B,Wyrwicka M K.Towards lean production in industry 4.0[J].Procedia Engineering,2017,182:466-473. |
15 | Shah R,Ward P T.Defining and developing measures of lean production[J].Journal of Operations Management,2007,25(4):785-805. |
16 | 张益,冯毅萍,荣冈.智慧工厂的参考模型与关键技术[J].计算机集成制造系统,2016,22(1):1-12. |
Zhang Y,Feng Y P,Rong G.Reference model and key technologies of smart factory[J].Computer Integrated Manufacturing Systems,2016,22(1):1-12. | |
17 | Hankel M,Rexroth B.The reference architectural model industrie4.0rami4.0) [EB/OL]. [2016-10-16].. |
18 | Datta P P,Roy R.Cost modelling techniques for availability type service support contracts: a literature review and empirical study[J].CIRP Journal of Manufacturing Science and Technology,2010,3(2):142-157. |
19 | Stapleton L,Dawton M,Tejan T.Systemic control, cultural values and religious institutions an assessment of semi-automatic human values systems analysis in religious institutional diagnostics [J].IFAC-PapersOnLine,2017,50(1):6373-6378. |
20 | 郭朝晖.在自动化投入与劳动力成本之间寻求平衡——工业4.0之我见[J].世界科学,2014, (8):18-19. |
Guo Z H.Seeking a balance between automation investment and labor costs—I see industry 4.0[J].World Science.2014, (8):18-19. | |
21 | Yamashina H,Kubo T.Manufacturing cost deployment [J].International Journal of Production Research,2002,40(16):4077-4091. |
22 | Windmark C,Gabrielson P,Andersson C,et al.A cost model for determining an optimal automation level in discrete batch manufacturing[J].Procedia CIRP,2012,3:73-78. |
23 | Chan S L,Lu Y,Wang Y.Data-driven cost estimation for additive manufacturing in cyber manufacturing[J].Journal of Manufacturing Systems,2018,46:115-126. |
24 | Sajadfar N,Ma Y.A hybrid cost estimation framework based on feature-oriented data mining approach[J].Advanced Engineering Informatics,2015,29(3):633-647. |
25 | Kuhlang P,Hempen S,Edtmayr T,et al.Systematic and continuous improvement of value streams[J].IFAC Proceedings Volumes,2013,46(9):993-997. |
26 | Tedeschi S,Rodrigues D,Emmanouilidis C,et al.A cost estimation approach for IoT modular architectures implementation in legacy systems[J].Procedia Manufacturing,2018,19:103-110. |
27 | Eklin M,Arzi Y,Shtub A.Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation[J].European Journal of Operational Research,2009,194(1):294-306. |
28 | Datta P P,Roy R.Cost modelling techniques for availability type service support contracts: a literature review and empirical study[J].CIRP Journal of Manufacturing Science and Technology,2010,3(2):142-157. |
29 | Tao F,Qi Q,Wang L,et al.Digital twins and cyber-physical systems toward smart manufacturing and industry 4.0: correlation and comparison[J].Engineering,2019,5(4):653-661. |
30 | Goguelin S,Colaco J,Dhokia V,et al.Smart manufacturability analysis for digital product development[J].Procedia CIRP,2017,60:56-61. |
31 | Bouazza W,Hamdadou D,Sallez Y,et al.Effective dynamic selection of smart products scheduling rules in FMS[J].Manufacturing Letters,2019,20:45-48. |
32 | Zhang H,Liang Y,Liao Q,et al.A hybrid computational approach for detailed scheduling of products in a pipeline with multiple pump stations[J].Energy,2017,119:612-628. |
33 | Prasad D,Jayswal S C.Scheduling in reconfigurable manufacturing system for uncertainty in decision variables[J].Materials Today: Proceedings,2018,5(9):18451-18458. |
34 | Chen Q,Deng L F,Wang H M.Optimization of multi-task job-shop scheduling based on uncertainty theory algorithm[J].International Journal of Simulation Modelling,2018,17(3):543-552. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||