[1] |
Yu Jiangzhong(于江中). Chronicle events of PVC market in 2013[EB/OL]. [2014-02]. http://www.sci99.com/n_44701.html
|
[2] |
Wang Ling(王凌), Zhou Gang(周刚), Xu Ye(许烨), Jin Yihui(金以慧). Research progress of hybrid flow shop scheduling [J]. Chemical Automation and Instuments(化工自动化及仪表), 2011, 38(1): 1-8
|
[3] |
Zheng Gang(郑刚), Tan Min(谭民), Song Yonghua(宋永华). Research progress of hybrid system [J]. Control and Decision(控制与决策), 2004, 19(1): 7-11
|
[4] |
Fanti Maria Pia, Iacobellis Giorgio, Mangini Agostino Marcello, Ukovich Walter. Freeway traffic modeling and control in a first-order hybrid petri net framework [J]. IEEE Transactions on Automation Science and Engineering, 2014, 11(1): 90-102
|
[5] |
Jia Yang(贾洋), Xiao Wu(肖武), Dong Hongguang(董宏光). Optimal design of self-organizing petri net [J]. CIESC Journal(化工学报), 2010, 61(12): 3167-3171
|
[6] |
Chu Yunfei, You Fengqi. Integrated planning, scheduling, and dynamic optimization for batch processes: MINLP model formulation and efficient solution methods via surrogate modeling [J]. Ind. Eng. Chem. Res., 2014, 53(34): 13391-13411
|
[7] |
Su Lijie, Tang Lixin. Unit-specific event based continuous-time formulation for scheduling hybrid process//Chinese Control and Decision Conference[C]. 2009
|
[8] |
Nie Yisu, Biegler Lorenz T, Villa Carlos M, Wassick John M. Discrete time formulation for the integration of scheduling and dynamic optimization [J]. Ind. Eng. Chem. Res., DOI: 10.1021/ie502960p
|
[9] |
Mockus L, Reklaitis G V. Continuous time representation approach to batch and continuous process scheduling (Ⅰ): MINLP formulation [J].Ind. Eng. Chem. Res., 1999, 38: 197-203
|
[10] |
Tang Qi, Zhang Qingshan. Research on the problem of scheduling multi-product batches in the process industry//The 26th Control and Decision Conference (2014 CCDC) [C].2014: 2702-2707
|
[11] |
Castro Pedro M, Barbosa-Póvoa Ana P, Matos Henrique A, Novais Augusto Q. Simple continuous-time formulation for short-term scheduling of batch and continuous processes [J]. Ind. Eng. Chem. Res., 2004, 43(1): 105-118
|
[12] |
Shi Lei, Jiang Yongheng, Huang Dexian. A novel probabilistic approximate Subgradient method in Lagrangian relaxation for flow-shop scheduling problems//10th IEEE International Conference on Control and Automation (ICCA) [C]. 2013
|
[13] |
Slak A, Tav?ar J, Duhovnik J. Case study analysis and genetic algorithm adaptation for job process planning and scheduling in batch production [J]. Journal of Design Research, 2014, 12(1): 52-57
|
[14] |
Liu Bo, Wang Ling, Liu Ying, Qian Bin, Jin Yihui. An effective hybrid particle swarm optimization for batch scheduling of polypropylene processes [J]. Computers and Chemical Engineering, 2010, 34: 518-528
|
[15] |
Kang Min-gu, Kang Sookil, Park Sunwon. Integrated scheduling for polyvinyl chloride processes [J]. Ind. Eng. Chem. Res., 2006, 45: 5729-5737
|
[16] |
Shah N, Liberis L, Izumoto E, Henson R. Integrated batch plant design a polymer plant case study [J]. Computers Chem. Engng., 1996, 20: 1233-1238
|
[17] |
Cheung Kwok Yuen, Hui Chi Wai. Total-site scheduling for better energy utilization [J]. Journal of Cleaner Production, 2004, 12: 171-184
|
[18] |
Zhou Jun(周军), Zhang Xinli(张新力), An Zhiming(安志明), Li Weixin(李维新). Cost analysis and control of PVC production by calcium calbide method [J]. Polyvinyl Chloride(聚氯乙烯), 2001, 3: 27-29
|
[19] |
Chan Jun Hoa, Chwan Dominic, Foo Yee, Kumaresan Sivakumar, Aziz Ramlan Abdul, Abu-Hassan Mohd Ariffin. An integrated approach for water minimisation in a PVC manufacturing process [J]. Clean Techn. Environ. Policy, 2008, 10: 67-79
|