[1] |
李慧芳, 李人厚, 陈浩勋. 化工批处理过程调度综述[J]. 信息与控制, 1999, 28(2): 127-135. DOI: 10.3969/j.issn. 1002-0411. 1999. 02. 010 LI H F, LI R H, CHEN H X. The survey of scheduling of batch chemical process[J]. Information and Control, 1999, 28(2): 127-135. DOI: 10.3969/j.issn. 1002-0411. 1999. 02. 010
|
[2] |
耿佳灿, 顾幸生. 不确定条件下中间存储时间有限多产品间歇生产过程调度[J]. 化工学报, 2015, 66(1): 357-365. GENG J C, GU X S. Time-constrained intermediate storage multiproduct batch process scheduling with uncertainty[J]. CIESC Journal, 2015, 66(1): 357-365.
|
[3] |
杨玉珍, 顾幸生. 多目标零等待间歇生产过程多任务调度[J]. 化工学报, 2013, 64(2):4978-4584. DOI: 10.3969/j.issn. 0438-1157. 2013. 12. 046 YANG Y Z, GU X S. Multi-objective no-wait multi-task scheduling problem of batch process[J]. CIESC Journal, 2013, 64(2):4978-4584. DOI: 10.3969/j.issn. 0438-1157. 2013. 12. 046.
|
[4] |
CARLOS A M, JAIME C, GROSSMAN I E. State-of-the-art review of optimization methods for short-term scheduling of batch processes[J]. Computers and Chemical Engineering, 2006, 30(6): 912-946
|
[5] |
MARAVELIAS C T. A general framework and modeling approach classification for chemical production scheduling[J]. AIChE Journal, 2012, 58(6): 1812-1834.
|
[6] |
NIE Y S, LORENZ T B, JOHN M W. Integrated scheduling and dynamic optimization of batch processes using state equipment networks[J]. AIChE Journal, 2012, 58(11): 3416-3434.
|
[7] |
CASTRO P M, BARBOSA-POVOA A P, Matos H A, et al. Simple continuous-time formulation for short-term scheduling of batch and continuous processes[J]. Ind. Eng. Chem. Res., 2004, 43(1): 105-120
|
[8] |
SUNDARAMOORTHY A, KARIMI I A. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants[J]. Chem. Eng. Sci., 2005, 60(10): 2679-2691
|
[9] |
MARAVELIAS C T, GROSSMAN I E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants[J]. Ind. Eng. Chem. Res., 2003, 42(19): 3056-3074
|
[10] |
CHU Y F, YOU F Q. Integration of production scheduling and dynamic optimization for multi-product CSTRs: generalized benders decomposition coupled with global mixed-integer fractional programming[J]. Computers and Chemical Engineering, 2013, 58(11): 315-333.
|
[11] |
CHEN G H, YAN L X, SHI B. Modeling and optimization for short-term scheduling of multipurpose batch plants[J]. Chinese Journal of Chemical Engineering, 2014, 22(6):682-689.
|
[12] |
SEID R, MAJOZI T. A robust mathematical formulation for multipurpose batch plants[J]. Chem. Eng. Sci., 2012, 68(1): 36-58
|
[13] |
吴建昱, 何小荣, 陈丙珍, 等. 新的多产品间歇生产调度的MILP模型[J]. 化工学报, 2003, 59(9):1252-1255. DOI: 10.3321/j.issn: 0438-1157.2003.09.016. WU J Y, HE X R, CHEN B Z, et al. A new continuous time MILP model for scheduling of multi-product batch Plants[J]. Journal of Chemical Industry and Engineering(China), 2003, 59(9):1252-1255. DOI: 10.3321/j.issn: 0438-1157. 2003.09.016.
|
[14] |
IERAPETRITOU M G, FLOUDAS C A. Effective continuous-time formulation for short-term scheduling(Ⅰ): Multipurpose batch processes[J]. Ind. Eng. Chem. Res., 1998, 37(9): 4341-4360.
|
[15] |
JANAK S L, LIN X, FLOUDAS C A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies[J]. Ind. Eng. Chem. Res., 2004, 43(10): 2516-2534.
|
[16] |
SHAIK M A, FLOUDAS C A. Unit-specific event-based continuous time approach for short-term scheduling of batch plants using RTN framework[J]. Comput. Chem. Eng., 2008, 32(1): 260-282.
|
[17] |
SHAIK M A, FLOUDAS C A. Novel unified modeling approach for short-term scheduling[J]. Ind. Eng. Chem. Res., 2009, 48(6): 2947-2964
|
[18] |
VOORADI R, SHAIK M A. Improved three-index unit-specific event-based model for short-term scheduling of batch plants[J]. Comput. Chem. Eng., 2012, 43(10): 148-172
|
[19] |
VOORADI R, SHAIK M A. Rigorous unit-specific event-based model for short-term scheduling of batch plants using conditional sequencing and unit-wait times[J]. Industrial and Engineering Chemistry Research, 2013, 52(36): 12950-12972
|
[20] |
SUNDARAMOORTHY A, KARIMI I A. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants[J]. Chem. Eng. Sci., 2005, 60(10): 2679-2690.
|