[1] |
Grossmann I E. Enterprise-wide optimization: a new frontier in process systems engineering [J]. AIChE Journal, 2005, 51 (7): 1846-1857
|
[2] |
Zhou Zhangyu (周章玉), Zeng Mingang (曾敏刚), Cheng Siwei (成思危), Hua Ben (华贲), Yin Qinghua (尹清华). Supply chain long range planning and investment decision making system in chemical industry [J]. Journal of Chemical Industry and Engineering (China) (化工学报), 2003, 54 (5): 659-664
|
[3] |
Cheng Huanong (程华农), Xiang Shuguang (项曙光), Yang Xin (杨鑫), Han Fangyu (韩方煜). Supply chain planning model under uncertainty [J]. Computers & Applied Chemsitry (计算机与应用化学), 2004, 21 (1): 97-102
|
[4] |
Zhou Ruijie, Li Lijuan, Xiao Wu, Dong Hongguang. Simultaneous optimization of batch process schedules and water-allocation network [J]. Computers & Chemical Engineering, 2009, 33 (6): 1153-1168
|
[5] |
Li Lijuan, Zhou Ruijie, Dong Hongguang. State-time-space superstructure-based MINLP formulation for batch water-allocation network design [J]. Industrial & Engineering Chemistry Research, 2010, 49 (1): 236-251
|
[6] |
Yan Liexiang (鄢烈祥), Hu Shenghua (胡晟华), Ma Dexian (麻德贤). Optimal multi-period operational planning for boiler steam systems [J]. Journal of Chemical Industry and Engineering (China) (化工学报), 2003, 54 (12): 1708-1712
|
[7] |
Dogan M E, Grossmann I E. A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants [J]. Industrial & Engineering Chemical Research, 2006, 45 (1): 299-315
|
[8] |
Munawar S A, Gudi R D. A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling [J]. Industrial & Engineering Chemical Research, 2005, 44 (11): 4011-4021
|
[9] |
Zhu X X, Majozi T. Novel continuous time MILP formulation for multipurpose batch plants (Ⅱ):Integrated planning and scheduling [J]. Industrial & Engineering Chemical Research, 2001, 40 (23): 5621-5634
|
[10] |
Shah N K, Ierapetritou M G. Integrated production planning and scheduling optimization of multisite, multiproduct process industry [J]. Computers & Chemical Engineering, 2012, 37: 214-226
|
[11] |
Luo Chunpeng, Rong Gang. A strategy for the integration of production planning and scheduling in refineries under uncertainty [J]. Chinese Journal of Chemical Engineering, 2009, 17 (1): 113-127
|
[12] |
Verderame P M, Floudas C A. Integrated operational planning and medium-term scheduling for large-scale industrial batch plants [J]. Industrial & Engineering Chemical Research, 2008, 47 (14): 4845-4860
|
[13] |
Zhang Yi (张毅), Dong Hongguang (董宏光), Xiao Wu (肖武). Progress of models and algorithms of supply chain in process industries [J]. Computers & Applied Chemsitry (计算机与应用化学), 2010, 27 (10): 1461-1464
|
[14] |
Sahinidis N V. Optimization under uncertainty: state-of-the-art and opportunities [J]. Computers & Chemical Engineering, 2004, 28 (6/7): 971-983
|
[15] |
You F, Grossmann I E. Design of responsive supply chains under demand uncertainty [J]. Computers & Chemical Engineering, 2008, 32 (12): 3090-3111
|
[16] |
Li J, Verderame P M, Floudas C A. Operational planning of large-scale continuous processes: deterministic planning model and robust optimization for demand amount and due date uncertainty [J]. Industrial & Engineering Chemical Research, 2012, 51 (11): 4347-4362
|
[17] |
Wang Jishuai (王继帅), Feng Yiping (冯毅萍), Rong Gang (荣冈), Liao Zuwei (廖组维). Managing financial risk in designing multi-echelon supply chain networks in petrochemical industry [J]. CIESC Journal (化工学报), 2010, 61 (12): 3172-3179
|
[18] |
Haitham M S L, Mohamed A A, Imad M A, Enzi A F. Optimizing the supply chain of a petrochemical company under uncertain operating and economic conditions [J]. Industrial & Engineering Chemical Research, 2004, 43 (1): 63-73
|
[19] |
You F, Wassick J M, Grossmann I E. Risk management for a global supply chain planning under uncertainty: models and algorithms [J]. AIChE Journal, 2009, 55 (4): 931-946
|
[20] |
Kondili E, Pantenlides C C, Sargent R W H. A general algorithm for short-term scheduling of batch operations (Ⅰ): MILP formulation [J]. Computers & Chemical Engineering, 1993, 17 (2): 211-227
|
[21] |
Ierapetritou M G, Floudas C A. Effective continuous-time formulation for short-term scheduling (Ⅰ): Multipurpose batch processes [J]. Industrial & Engineering Chemical Research, 1998, 37 (11): 4341-4359
|
[22] |
Chand S, Hsu V N, Sethi S. Forecast, solution, and rolling horizons in operations management problems: a classified bibliography [J].Manufacturing & Service Operations Management, 2002, 4 (1): 25-43
|
[23] |
Li Z, Ierapetritou M G. Integrated production planning and scheduling using a decomposition framework [J]. Chemical Engineering Science, 2009, 64 (16): 3585-3597
|