[1] |
Paun G.Computing with membranes[J].Journal of Computer Systems and Science,2000,61(1):108-143
|
[2] |
Ciobanu G,Paun G,Perez-Jimenez J M.Applications of Membrane Computing[M].Berlin:Springer Science & Business,2006:33
|
[3] |
Ionescu M,Paun G,Yokomori T.Spiking neural P systems[J].Fundamenta Informaticae,2006,71(2/3):279-308
|
[4] |
Calude S C,Paun G.Bio-steps beyond Turing[J].Biosystems,2004,77(1/2/3):175-194
|
[5] |
Nishida T Y.An application of P system:a new algorithm for NP-complete optimization problems//Proceedings of 8th World Multi-conference on Systems,Cybernetics and Informations.2004:109-112
|
[6] |
Huang L,He X X,Wang N,Xie Y.P system based multi-objective optimization algorithm[J].Progress in Natural Science,2007,17(4):458-465
|
[7] |
Huang L,Wang N,Zhao J H.Multiobjective optimization for controllers[J].Acta Automatica Sinica,2008,34(4):472-477
|
[8] |
Zhao J,Wang N.A bio-inspired algorithm based on membrane computing and its application to gasoline blending scheduling[J].Computers and Chemical Engineering,2011,35(2):272-283
|
[9] |
Zhang G X,Gheorghe M,Wu C Z.A quantum-inspired evolutionary algorithm based on P systems for knapsack problem[J].Fundamenta Informaticae,2008,87(1):93-116
|
[10] |
Chen A,Chootinan P.Constraint handling in genetic algorithms using a gradient-based repair method[J].Computers&Operations Research,2006,33(8):2263-2281
|
[11] |
Lu H Y,Chen W Q.Self-adaptive velocity particle swarm optimization for solving constrained optimization problems[J].Journal of Global Optimization,2008,41(3):427-445
|
[12] |
Zhao X Q,Rong G.Blending scheduling based on partial swarm optimization algorithm//Proceedings of the 2004 IEEE International Conference on Information Reuse and Integration(IRI-2004).2004:618-622
|
[13] |
Mendez C A,Grossmann I E,Harjunkoski I,Kabore P.A simultaneous optimization approach for off-line blending and scheduling of oil-refinery operations[J].Computers and Chemical Engineering,2006,30(4):614-634
|
[14] |
Li P,Wendt M,Wozeny G.Optimal production planning for chemical processes under uncertain market conditions[J].Chemical Engineering and Technology,2004,27(6):641-651
|
[15] |
Jia Z Y,Ierapetritou M.Mixed-integer linear programming model for gasoline blending and distribution scheduling[J].Industrial&Engineering Chemistry Research,2003,42(4):825-835
|
[16] |
Singh A,Forbes J F,Vermeer P J,Woo S S.Model-based real-time optimization of automotive gasoline blending operations[J].Journal of Process Control,2000,10(1):43-58
|