[1] |
Lu Ningyun (陆宁云), Wang Fuli (王福利), Gao Furong (高福荣), Wang Shu (王姝).Statistical modelling and online monitoring for batch processes[J].Acta Automatic Sinica (自动化学报), 2006, 32 (3):400-410
|
[2] |
Li Ganping (李赣平), Yan Weiwu (阎威武), Shao Huihe (邵惠鹤).Iterative particle swarm algorithm and its application to batch process optimization[J].Computer Simulation (计算机仿真), 2007, 24 (6):160-163
|
[3] |
Grabowski J, Pempera J.Sequencing of jobs in some production system[J].European Journal of Operational Research, 2000, 125 (3):535-550
|
[4] |
Lei D M.Multi-objective production scheduling:a survey[J].Int.J.Adv.Manuf.Tech., 2009, 43 (9/10):926-938
|
[5] |
Floudas C A, Lin X.Continuous-time versus discrete-time approaches for scheduling of chemical processes:a review[J].Computers and Chemical Engineering, 2004, 28:2109-2129
|
[6] |
Mendez C A, Cerda J, Grossmann I E, Harjunkoski I, Fahl M.State-of-the-art review of optimization methods for short-term scheduling of batch processes[J].Computers and Chemical Engineering, 2006, 30 (6/7):913-946
|
[7] |
Qian Yu, Pan Ming, Huang Yacai.Modeling and optimization for scheduling of chemical batch processes[J].Chinese Journal of Chemical Engineering, 2009, 17 (1):1-7
|
[8] |
Shi Bin (史彬), Yan Liexiang (鄢烈祥).Scheduling of multi-purpose batch process with parallel units[J].CIESC Journal (化工学报), 2010, 61 (11):2875-2880
|
[9] |
Yang Guojun (杨国军), Li Xiuxi (李秀喜), Chen Yun (陈赟), Qian Yu (钱宇).Real-time optimization for batch process[J].CIESC Journal (化工学报), 2011, 62 (10):2839-2844
|
[10] |
Shi Yanhong, Yuan Mingzhe, Wang Tianran, Yuan Decheng.A survey on dynamic optimization methods of batch processes[J].Information and Control, 2012, 41 (1):75-82
|
[11] |
Dai Yiyang (戴一阳), Chen Ning (陈宁), Zhao Jinsong (赵劲松), Chen Bingzhen (陈丙珍).Application of AIS to batch chemical process fault diagnosis[J].CIESC Journal (化工学报), 2009, 60 (1):172-176
|
[12] |
Yao Yuan, Gao Furong.Batch process monitoring in score space of two-dimensional dynamic principal component analysis[J].Industry and Engineering Chemistry Research, 2007, 46 (24):8033-8043
|
[13] |
Chiang T C, Fu L C.Using dispatching rules for job shop scheduling with due date-based objectives[J].International Journal of Production Research, 2007, 45 (14):3245-3262
|
[14] |
Schuster C.No-wait job shop scheduling:tabu search and complexity of subproblems[J].Mathematical Methods of Operations Research, 2006, 63 (3):473-491
|
[15] |
Zhu J, Li X P.An effective meta-heuristic for no-wait job shops to minimize makespan[J].IEEE Transactions on Automation Science and Engineering, 2012, 9 (1):189-198
|
[16] |
Ghosh D, Sierksma G.Complete local search with memory[J].Journal of Heuristics, 2002, 8 (6):571-584
|
[17] |
Deb K, Pratap A, Agarwal S, Meyarivan T. A fast and elitist multiobjective genetic algorithm:NSGA-Ⅱ[J].IEEE Transaction on Evolutionary Computation, 2002, 6 (2):182-197
|
[18] |
Zitzler E, Laumanns M, Thiele L.SPEA Ⅱ:improving the strength pareto evolutionary algorithm, working paper[R].Germany:Computer Engineering and Networks Laboratory (TIK), 2001
|
[19] |
Zitzler E, Deb K, Thiele L.Comparison of multiobjective evolutionary algorithms:empirical results[J].Evolutionary Computation, 2000, 8 (2):173-195
|
[20] |
Zitzler E.Evolutionary algorithms for multiobjective optimization:methods and applications[D].Shaker Verlag:Aachen, 1999
|