1 |
Xie S W,Xie Y F,Ying H,et al.A hybrid control strategy for real-time control of the iron removal process of the zinc hydrometallurgy plants[J].IEEE Transactions on Industrial Informatics,2018,14(12):5278-5288.
|
2 |
桂卫华,阳春华,陈晓方,等.有色冶金过程建模与优化的若干问题及挑战[J].自动化学报,2013,39(3):197-207.
|
|
Gui W H,Yang C H,Chen X F,et al.Modeling and optimization problems and challenges arising in nonferrous metallurgical processes[J].Acta Automatica Sinica,2013,39(3):197-207.
|
3 |
周晓君,阳春华,桂卫华.全局优化视角下的有色冶金过程建模与控制[J].控制理论与应用,2015,32 (9):1158-1169.
|
|
Zhou X J,Yang C H,Gui W H.Modeling and control of nonferrous metallurgical processes on the perspective of global optimization[J].Control Theory & Applications,2015,32(9):1158-1169.
|
4 |
Zhang B,Yang C H,Zhu H Q,et al.Evaluation strategy for the control of the copper removal process based on oxidation–reduction potential[J].Chemical Engineering Journal,2016,284:294-304.
|
5 |
Zhang B,Yang C H,Li Y G,et al.Additive requirement ratio prediction using trend distribution features for hydrometallurgical purification processes[J].Control Engineering Practice,2016,46:10-25.
|
6 |
Zhang B,Yang C H,Zhu H Q,et al.Controllable-domain-based fuzzy rule extraction for copper removal process control[J].IEEE Transactions on Fuzzy Systems,2017,26(3):1744-1756.
|
7 |
Demirkıran N,Ekmekyapar A,Künkül A,et al.A kinetic study of copper cementation with zinc in aqueous solutions[J].International Journal of Mineral Processing,2007,82(2):80-85.
|
8 |
Ahmed I M,El-Nadi Y A,Daoud J A.Cementation of copper from spent copper-pickle sulfate solution by zinc ash[J].Hydrometallurgy,2011,110(1/2/3/4):62-66.
|
9 |
Gros F,Baup S,Aurousseau M.Copper cementation on zinc and iron mixtures(2): Fluidized bed configuration[J].Hydrometallurgy,2011,106(1/2):119-126.
|
10 |
Zhang B,Yang C H,Zhu H Q,et al.Kinetic modeling and parameter estimation for competing reactions in copper removal process from zinc sulfate solution[J].Industrial & Engineering Chemistry Research,2013,52(48):17074-17086.
|
11 |
Li Y G,Gui W H,Teo K L,et al.Optimal control for zinc solution purification based on interacting CSTR models[J].Journal of Process Control,2012,22(10):1878-1889.
|
12 |
张凤雪,阳春华,周晓君,等.基于控制周期计算的锌液净化除铜过程优化控制[J].控制理论与应用,2017,34(10):1388-1395.
|
|
Zhang F X,Yang C H,Zhou X J,et al.Optimal control based on control period calculation for copper removal process of zinc solution purification[J].Control Theory & Applications,2017,34(10):1388-1395.
|
13 |
Huang M,Zhou X,Huang T,et al.Dynamic optimization based on state transition algorithm for copper removal process[J].Neural Computing and Applications,2019,31(7):2827-2839.
|
14 |
Zhou X J,Huang M,Huang T W,et al.Dynamic optimization for copper removal process with continuous production constraints[J].IEEE Transactions on Industrial Informatics,2019.DOI:10.1109/TII.2019.2943500.
DOI
|
15 |
Charnes A,Cooper W W,Symonds G H.Cost horizons and certainty equivalents: an approach to stochastic programming of heating oil[J].Management Science,1958,4(3):235-263.
|
16 |
Charnes A,Cooper W W.Chance-constrained programming[J].Management Science,1959,6(1):73-79.
|
17 |
Boggs P T,Tolle J W.Sequential quadratic programming[J].Acta Numerica,1995,4:1-51.
|
18 |
Gill P E,Wong E.Sequential quadratic programming methods[M]//Mixed Integer Nonlinear Programming.New York:Springer,2012:147-224.
|
19 |
王耀武,彭建平,狄跃忠,等.铝电解槽干式防渗料在电解过程中的反应机理探讨[J].化工学报,2019,70(3):1035-1041.
|
|
Wang Y W,Peng J P,Di Y Z,et al.Mechanism of deterioration for dry barrier material in aluminum electrolysis cells[J].CIESC Journal,2019,70(3):1035-1041.
|
20 |
牛大鹏,刘元清.基于改进即时学习算法的湿法冶金浸出过程建模[J].化工学报,2017,68(7):2873-2879.
|
|
Niu D P,Liu Y Q.Modeling hydrometallurgical leaching process based on improved just-in-time learning algorithm[J].CIESC Journal,2017,68(7):2873-2879.
|
21 |
Näsi J.Statistical analysis of cobalt removal from zinc electrolyte using the arsenic-activated process[J].Hydrometallurgy,2004,73(1/2):123-132.
|
22 |
Yang C H,Zhou X J,Zhu H Q,et al.Process modeling issues arising in zinc hydrometallurgy[J].Science Foundation in China,2015,23(2):66-80.
|
23 |
Laatikainen K,Lahtinen M,Laatikainen M,et al.Copper removal by chelating adsorption in solution purification of hydrometallurgical zinc production[J].Hydrometallurgy,2010,104(1):14-19.
|
24 |
阳春华,韩洁,周晓君,等.有色冶金过程不确定优化方法探讨[J].控制与决策,2018,33(5):856-865.
|
|
Yang C H,Han J,Zhou X J,et al.Discussion on uncertain optimization methods for nonferrous metallurgical processes[J].Control and Decision,2018,33(5):856-865.
|
25 |
Zhang F X,Yang C H,Zhou X J,et al.Fractional order fuzzy PID optimal control in copper removal process of zinc hydrometallurgy[J].Hydrometallurgy,2018,178:60-76.
|
26 |
柴天佑.复杂工业过程运行优化与反馈控制[J].自动化学报,2013,39(11):1744-1757.
|
|
Chai T Y.Operational optimization and feedback control for complex industrial processes[J].Acta Automatica Sinica,2013,39(11):1744-1757.
|
27 |
Wendt M,Li P,Wozny G.Nonlinear chance-constrained process optimization under uncertainty[J].Industrial & Engineering Chemistry Research,2002,41(15):3621-3629.
|
28 |
Geletu A,Hoffmann A,Klöppel M,et al.Monotony analysis and sparse-grid integration for nonlinear chance constrained process optimization[J].Engineering Optimization,2011,43(10):1019-1041.
|
29 |
Garcia H A,Wozny G.Chance constrained optimization of process systems under uncertainty(I): Strict monotonicity[J].Computers & Chemical Engineering,2009,33(10):1568-1583.
|
30 |
Li P,Arellano-Garcia H,Wozny G.Chance constrained programming approach to process optimization under uncertainty[J].Computers & Chemical Engineering,2008,32(1/2):25-45.
|
31 |
Zhang H,Li P.Chance constrained programming for optimal power flow under uncertainty[J].IEEE Transactions on Power Systems,2011,26(4):2417-2424.
|
32 |
Zhang H,Li P.Probabilistic analysis for optimal power flow under uncertainty[J].IET Generation,Transmission & Distribution,2010,4(5):553-561.
|