[1] |
Shahriari M,Shee A,Ortengren R.The development of critical criteria to improve the alarm system in the process industry[J].Human Factors and Ergonomics in Manufacturing,2006,16(3):321-337
|
[2] |
Bristol E H.Improved process control alarm operation[J].ISA Transactions,2001,40:191-205
|
[3] |
Bransby M L,Jenkinson J.Alarm management in the chemical and power industries:results of a survey for the HSE//IEE Colloquium on Stemming the Alarm Flood.London,1997
|
[4] |
Brown D C.Alarm management experience in BP oil//IEE Colloquium on Stemming the Alarm Flood.London,1997
|
[5] |
Foong O,Suziah,Rohaya D,Syazwani N.ALAP:alarm prioritization system for oil refinery//Proceedings of the World Congress on Engineering and Computer Science.San Francisco,2009
|
[6] |
Izadi I,Shah S L,Shook D S,Chen T.An introduction to alarm analysis and design//Proceedings of the 7th IFAC Symposium on Fault Detection Supervision and Safety of Technical Processes.Barcelona,2009:651-656
|
[7] |
Wit J de.EEMUA recommendations for the design and construction of refrigerated liquefied gas storage tanks[J].Cryogenics,1998,28(12):800-804
|
[8] |
Chao C S,Liu A C.An alarm management framework for automated network fault identification[J].Computer Communications,2004,27(13):1341-1353
|
[9] |
Jiang R.Optimization of alarm threshold and sequential inspection scheme[J].Reliability Engineering and System Safety,2010,95:208-215
|
[10] |
Mezache A,Soltani F.A novel threshold optimization of ML-CFAR detector in Weibull clutter using fuzzy-neural networks[J].Signal Processing,2007,87:2100-2110
|
[11] |
Verdier G,Hilgert N,Vila J P.Adaptive threshold computation for CUSUM-type procedures in change detection and isolation problems[J].Computational Statistics and Data Analysis,2008,52:4161-4174
|
[12] |
Brooks R,Thorpe R,Wilson J.A new method for defining and managing process alarms and for correcting process operation when an alarm occurs[J].Journal of Hazardous Materials,2004,115:169-174
|
[13] |
Chen J.On reducing false alarms in multivariate statistical process control[J].Chemical Engineering Research and Design,2010,88:430-436
|
[14] |
Zhu Hengwei(朱恒伟),Wang Kechang(王克昌),Chen Qizhi(陈启智).Adaptive thresholds algorithm for fault detection of liquid rocket engine in ground test[J].Journal of Propulsion Technology(推进技术),2000,21(1):1-4
|
[15] |
Yu Chuanqiang(于传强),Guo Xiaosong(郭晓松).Slide bandwidth kernel density estimation algorithm based on estimate point [J].Acta Armamentarii(兵工学报),2009,30(2):231-235
|
[16] |
Bian Zhaoqi(边肇奇),Zhang Xuegong(张学工).Pattern Recognition(模式识别)[M].Beijing:Tsinghua University Press,2000
|
[17] |
Downs J J,Vogel E F.A plant-wide industrial process control problem[J].Computers Chem. Engng.,1993,17(3):245-255
|